{"id":96038,"date":"2018-07-26T14:27:06","date_gmt":"2018-07-26T18:27:06","guid":{"rendered":"http:\/\/madisoncountycourier.com\/?p=96038"},"modified":"2018-07-26T10:52:20","modified_gmt":"2018-07-26T14:52:20","slug":"city-of-oneida-roadway-milling-planned","status":"publish","type":"post","link":"https:\/\/madisoncountycourier.com\/?p=96038","title":{"rendered":"City of Oneida: Roadway milling planned"},"content":{"rendered":"<p><strong><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-80375\" src=\"https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1-300x268.jpg?resize=300%2C268\" alt=\"\" width=\"300\" height=\"268\" srcset=\"https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1.jpg?resize=300%2C268&amp;ssl=1 300w, https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1.jpg?resize=150%2C134&amp;ssl=1 150w, https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1.jpg?resize=900%2C804&amp;ssl=1 900w, https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1.jpg?resize=400%2C357&amp;ssl=1 400w, https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1.jpg?w=1251&amp;ssl=1 1251w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>City of Oneida: Roadway milling planned<\/strong><\/p>\n<p>The top layer of asphalt on portions of the following roadways will be milled to prepare for paving starting Tuesday, July 31, 2018:<\/p>\n<ul>\n<li>Washington Avenue<\/li>\n<li>Warner Street<\/li>\n<li>Cedar Street<\/li>\n<li>Elm Street<\/li>\n<li>East Sands Street<\/li>\n<li>Chappell Street<\/li>\n<li>Cobb Street<\/li>\n<li>Phillips Street<\/li>\n<li>Boston Street<\/li>\n<li>Randall Avenue<\/li>\n<li>Staudt Street<\/li>\n<\/ul>\n<p>Temporary roadway closures will occur as a result of the work being conducted. The city of Oneida Department of Public Works will be assisting a contractor with construction operations.<\/p>\n<p>The DPW asks that the public be patient with roadway conditions, as resurfacing could take place several weeks after the initial surface milling.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>City of Oneida: Roadway milling planned The top layer of asphalt on portions of the following roadways will be milled to prepare for paving starting Tuesday, July 31, 2018: Washington Avenue Warner Street Cedar Street Elm Street East Sands Street Chappell Street Cobb Street Phillips Street Boston Street Randall Avenue Staudt Street Temporary roadway closures [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":80375,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[3,8],"tags":[],"class_list":["post-96038","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-top-story"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/p43meu-oZ0","jetpack_featured_media_url":"https:\/\/i0.wp.com\/madisoncountycourier.com\/wp-content\/uploads\/2017\/05\/Road-Closed-1.jpg?fit=1251%2C1118&ssl=1","_links":{"self":[{"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=\/wp\/v2\/posts\/96038","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96038"}],"version-history":[{"count":0,"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=\/wp\/v2\/posts\/96038\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=\/wp\/v2\/media\/80375"}],"wp:attachment":[{"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96038"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96038"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/madisoncountycourier.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96038"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}